ACRONYM: VINO
Vibration and Noise Drop by Light High Damping Structures
Sitemap Rail Traffic
Sitemap Road Traffic
Sitemap Air Traffic
Sitemap Outdoor Equipment
Sitemap Maritime Traffic
Sitemap Health Aspects
Sitemap Noise Exposure
  General Information

Production time reduction is one of the main requirements for manufacturing processes today. In order to achieve this goal, machines are becoming lighter and poorly damped. Therefore, dynamic and acoustical problems have been stressed. The aim of this project is to solve that problem using glued light and highly damping structures made of cheap conventional materials. An agile integrated design environment, a methodology to get damping information and design guide for glued structures will be provided. Techniques, skills and tools developed will be tested on three real scenarios. The selected machines cover a wide range of requirements to analyse the possibility of generalisation of the solution provided to other machines and even other sectors (track systems, cars, lifts, etc.) that deal with similar problems (energy saving, noise and vibration control, production costs, etc.).

  Project Data
Project Type: EU Project
Project Ref. No.: G1RD-2000-00306
Duration: 1 March 2001 - 29 Feb. 2004
Main Contractor: NICOLAS CORREA SA
Contact Person: Juan Carlos Monje Pardo
  Tel: +34-94-7288100
  Email: j.monje@correa.es
Costs: 3,510,000 €
Project Homepage: not available
  Partners (5)
ADIGE SALA S.P.A.  IT
CE.S.I. CENTRO STUDI INDUSTRIALI  IT
EDERENA CONCEPT FR FUNDACION TEKNIKER  ES
INNSE BERARDI S.P.A.  IT
NICOLAS CORREA SA  ES
  Download
PDF File for Printout and/or Download

Left Click: "Open PDF ... "   •   Right Click: "Save Target as ... "