ACRONYM: HSG
High Speed Grinding
Sitemap Rail Traffic
Sitemap Road Traffic
Sitemap Air Traffic
Sitemap Outdoor Equipment
Sitemap Maritime Traffic
Sitemap Health Aspects
Sitemap Noise Exposure
  General Information

The wheel rail contact causes an important portion of the noise emission of the rail traffic. Mechanical load results in corrugation of the tracks, short and long ripples on the rail surface. These ripples lead to oscillation of the rail in the frequency range perceivable by the human ear. Such ripples can be eliminated by means of grinding. Depending on the amount of wear grinding results in a noise level reduction of 3 dBA up to 20 dBA.

The effectiveness of the grinding procedures can be still improved. Disadvantages of the present grinding technology are:

  • low speed during the grinding process (only 3 to 5 km/h, leading to severe operation restrictions and high costs)
  • too long time cycles of the currently practised grinding compared to generation of ripples.

The subject of the project is the development and the optimisation of a preventative grinding strategy based on a new grinding machine for regular fast care of rails. The operating speed should be up to 100 km/h (avoiding restrictions of operation due to the high operating speeds) while at the same time warranting a noise reduction of 3 dBA. The creation of rolling contact fatigue failure and ripples should be prevented by regular rail care (significant reduction of the grinding cycles). The life span of the rail should be extended (thus reduction of the life cycle costs) due to the minimisation of the material removal by grinding. This will result in a significant reduction of the entire maintenance cost compared to conventional procedures.

  Project Data
Project Type: National Project (Germany)
Project Ref. No.: Sub-Project of QUIET TRAFFIC
Duration: 1 Aug. 2003 - 30 June 2006
Main Contractor: RAIL CENTER BUETZOW - RCB
Contact Person: Marcel Taubert
  Tel: +49-4105-585319
  Email: marcel.taubert@stahlberg-roensch.de
Costs: not available
Project Homepage: not available
  Partners (3)
BUNDESMINISTERIUM FÜR BILDUNG UND FORSCHUNG (BMBF)  DE
RAIL CENTER BUETZOW - RCB  DE
TECHNISCHE UNIVERSITÄT BERLIN  DE
  Download
PDF File for Printout and/or Download